Skip to main content
Pro Energise

RMD Kwikform

Electrical works for a major construction equipment company

£8m+ Group Revenue35+ VehiclesEmployed Workforce48-Hour Digital Handover
Project Overview

Scope of Works

Pro Energise delivered electrical works for RMD Kwikform at their construction equipment depot facility. The scope included power infrastructure upgrades to support heavy industrial equipment, distribution board replacements, new lighting installations across warehouse and yard areas, and compliance remedial works.

The works were delivered in a live operational environment with heavy plant movements and strict safety protocols. All operatives completed site-specific inductions and worked within RMD Kwikform's permit-to-work system.

Evidence of Capability

What This Project Demonstrates

  • Heavy industrial environment — construction equipment depot with active plant movements
  • Permit-to-work integration — operatives working within the client's safety management system
  • Site-specific inductions — all personnel inducted into depot-specific hazards and protocols
  • Heavy power infrastructure — upgrades to support industrial equipment loads
  • Internal and external scope — warehouse lighting and yard area lighting under one contract
  • Recognised construction sector client — RMD Kwikform is a major Tier 1 construction equipment provider
Measured Outcomes

Delivery Outcomes

Safety

Works in live depot environment with heavy plant movements without incident

Client Integration

Operatives inducted and working within RMD Kwikform permit-to-work system

Scope

Power upgrades, DB replacements, warehouse lighting, yard lighting, compliance remedials

Documentation

Full safety documentation and test certification

Disruption

Depot operations maintained throughout

Services for RMD Kwikform

Services Delivered

Commercial Electrical Installation Services

Power infrastructure upgrades to support heavy industrial equipment, distribution board replacements, and new lighting installations across warehouse and yard areas.

Electrical Compliance Upgrades & Remedial Works

Compliance remedial works identified during inspections, addressed as part of the main installation programme.

Delivery Framework

Delivery Controls Applied

This project was delivered under Pro Energise's structured commercial delivery framework, including:

  • Site-specific inductions for all operatives covering heavy plant movements, exclusion zones, and depot safety protocols
  • Works delivered within RMD Kwikform's permit-to-work system
  • Coordination with depot operations to schedule works around crane and plant movements
  • Digital QA evidence capture including safety documentation
  • Full commissioning and test certification handover

Project delivery tracked through our Contracts OS management platform.

From 2026, all commercial projects are formally tracked against defined KPI measures.

Industrial & Logistics

Environment & Sector Context

Construction equipment depots are high-risk industrial environments. Heavy plant movements, overhead crane operations, and steel handling create hazards that electrical contractors must actively manage. Works cannot proceed without formal permits, and all personnel must understand the specific risks of the depot environment.

RMD Kwikform is a recognised name in the construction sector. Their safety standards reflect Tier 1 expectations. Delivering within their permit-to-work system demonstrates that Pro Energise can integrate with enterprise-grade safety management — a capability that transfers directly to Tier 1 supply chain work.

View Industrial & Logistics sector experience

Discuss a Similar Project

Tell us about your scope and we will confirm how we can deliver.

ISO-certified · £10m PL cover · Employed workforce