Scope of Works

Pro Energise delivered electrical installation works at AJN Steelstock's heavy industrial distribution facility. The scope included new power circuit installations, lighting upgrades across warehouse bays, and external lighting for loading areas.

The installation was completed on programme with zero snags at handover. Works were coordinated around crane operations and steel handling activities, with all operatives briefed on the specific hazards of the heavy industrial environment.

Evidence of Capability

What This Project Demonstrates

  • Heavy industrial delivery — steel distribution facility with overhead cranes and heavy material handling
  • Zero snags at handover — clean completion, no remediation required
  • Hazardous environment awareness — operatives briefed on steel distribution-specific risks
  • Internal and external scope — warehouse bay lighting and loading area external lighting
  • Delivered on programme — completion to agreed timeline
Measured Outcomes

Delivery Outcomes

Quality

Zero snags at handover

Programme

Completed on programme

Safety

Works coordinated around crane operations and steel handling

Scope

Power circuits, warehouse bay lighting, external loading area lighting

Services for AJN Steelstock

Services Delivered

Commercial Electrical Installation Services

New power circuit installations, warehouse bay lighting upgrades, and external lighting for loading areas. Works commissioned to BS 7671.

Delivery Framework

Delivery Controls Applied

This project was delivered under Pro Energise's structured commercial delivery framework, including:

  • Operatives briefed on steel distribution environment hazards including crane operations and heavy material handling
  • Works coordinated around crane movements and loading schedules
  • Digital QA evidence capture
  • Commissioning and handover with zero snags

Project delivery tracked through our Contracts OS management platform.

From 2026, all commercial projects are formally tracked against defined KPI measures.

Industrial & Logistics

Environment & Sector Context

Steel distribution facilities are among the most hazardous industrial environments for electrical works. Overhead cranes moving heavy steel stock create exclusion zones that shift throughout the working day. Loading areas have constant vehicle movements. Electrical contractors must plan works dynamically around these operations.

The lighting scope — warehouse bays and external loading areas — is particularly relevant. Industrial lighting must deliver high lux levels for safe material handling and vehicle operations, often at significant mounting heights requiring access equipment coordinated around operational activity.

View Industrial & Logistics sector experience

Discuss a Similar Project

Tell us about your scope and we will confirm how we can deliver.

ISO-certified · £10m PL cover · Employed workforce